Miscellaneous and non-defense topics > Infrastructure and Nautical Highways

North-South Commuter Railway project (NSCR)

<< < (10/10)

adroth:

--- Quote from: adroth on January 12, 2020, 04:48:45 PM ---These photos were shared in the forum's FB extension here:

https://www.facebook.com/groups/rpdefense/permalink/2651286814957149/?comment_id=2651652881587209

The community member that shared these reported that the photos were taken behind Tabing Ilog Elementary in Bocaue

Ran them by the PHRS FB page, whose members confirm that these are indeed part of NSCR activity in Bulacan.







--- End quote ---

adroth:

--- Quote from: adroth on January 18, 2020, 01:13:02 PM ---https://www.facebook.com/DOTrPH/posts/1588756731263457

Actual construction works at the Calumpit Main Site Yard of the ongoing PNR Clark Phase 1 (Tutuban-Malolos)!

This facility located in Calumpit, Bulacan is a 14-hectare area that serves as the main production site for the precast segments of Contract Package 2 of the PNR Clark Phase 1. CP02 covers the construction works for three stations, namely, Balagtas, Guiginto, and Malolos.

This yard will include a batching plant for the supply of concrete to expedite precast segment production and other fabrication requirements.

Once PNR Clark Phase 1 is fully operational, the 38-km elevated rail line will reduce travel time between Manila and Bulacan from one (1) hour and 30 minutes to just 35 minutes.

The rail line is expected to serve 300,000 passengers daily.

====















--- End quote ---

adroth:
North South Commuter Railway (NSCR) Fr. Tutuban to Malolos Update As Of Jan. 16, 2021

https://www.youtube.com/watch?v=S9VtDvjgqZQ

Navigation

[0] Message Index

[*] Previous page

Go to full version