SMF - Just Installed!
https://www.facebook.com/DOTrPH/posts/1488138957991902Actual construction works at the Calumpit Main Site Yard of the PNR Clark Phase 1 (Manila-Bulacan)!This facility located in Calumpit, Bulacan is a 14-hectare area that serves as the main production site for the precast segments of Contract Package 2 of the PNR Clark Phase 1. CP02 covers the construction works for three stations, namely, Balagtas, Guiginto, and Malolos.This yard will include a batching plant for the supply of concrete to expedite precast segment production and other fabrication requirements.Ongoing works at the yard include backfilling, which is now at 98% progress rate, piling which is targeted to be completed by mid-November, and the foundation works for the establishment of the Engineer's Office and Site Laboratory.Furthermore, various specialized equipment such as the Tower Crane and Gantry Crane are expected to arrive soon to complement the ongoing site development work.Transportation Secretary Arthur Tugade has ordered work to be done 24/7 to accelerate completion of the project, and has mandated the consultants to provide a daily progress report.Once PNR Clark Phase 1 is fully operational, the 37.6-kilometer mass railway system will reduce travel time between Manila and Bulacan from one (1) hour and 30 minutes to just 35 minutes. This rail line is expected to serve 300,000 passengers daily.====
http://main.ps-philgeps.gov.ph/home/images/BAC/ForeignAssitedProjects/06132018/PACKAGE%20CP01/GBB%203/Pre-Bid%20Conference%20Presentation.pdf