SMF - Just Installed!
These photos were shared in the forum's FB extension here:https://www.facebook.com/groups/rpdefense/permalink/2651286814957149/?comment_id=2651652881587209The community member that shared these reported that the photos were taken behind Tabing Ilog Elementary in BocaueRan them by the PHRS FB page, whose members confirm that these are indeed part of NSCR activity in Bulacan.
https://www.facebook.com/DOTrPH/posts/1588756731263457Actual construction works at the Calumpit Main Site Yard of the ongoing PNR Clark Phase 1 (Tutuban-Malolos)!This facility located in Calumpit, Bulacan is a 14-hectare area that serves as the main production site for the precast segments of Contract Package 2 of the PNR Clark Phase 1. CP02 covers the construction works for three stations, namely, Balagtas, Guiginto, and Malolos.This yard will include a batching plant for the supply of concrete to expedite precast segment production and other fabrication requirements.Once PNR Clark Phase 1 is fully operational, the 38-km elevated rail line will reduce travel time between Manila and Bulacan from one (1) hour and 30 minutes to just 35 minutes.The rail line is expected to serve 300,000 passengers daily.====